Faculty Details | Power Management Institute

Mr. Anoop Kumar

Name: Mr. Anoop Kumar
Qualification: B. Tech. (Mechanical Engineering), MBA(HR)
Designation: Sr. Manager
E-Mail: anoopkumar@ntpc.co.in

Teaching and Research

    • Lecturer in Mechanical Engineering Deptt. in College of Engineering and Rural Technology, Meerut affiliated to UP Technical University (2000-2003).
    • Faculty Member in PMI in the area of Technical Training and Indusrial Safety
    • Teaching Experience: Engineering Mechanics, Thermal Engineering, Mechanics of Solids, Kinematics and Dynamics of machines, Operation Research, Fluid Mechanics, Heat and Mass Transfer, Behaviour based Safety, Energy Conservation
    • Kumar, Anoop and Tripathi, G.C. (2016), "Green Human Resource Management: A Paradigm Shift in HR Practices of Indian Power Sector in Context with Paris Climate Summit 2015", 23rd World Energy Congress 2016, Istanbul, Turkey, Volume 1, pp435-458
    • Kumar, Anoop (2016), "Sustainable Energy System Optimization: A Review of Markal Model in India", research paper presented in 49th Annual Convention of the Operational Research Society of India & International Conference on Analytics in Operation Research, 12-14 Dec 2016
    • Kumar, Anoop (2017), "Green HR Management: The need of the hour" A Journal of 'Power People', Volume 9, Issue-1, pp13-15
    • Various articles published in NTPC in-house magazines and local news papers on Hindi literature and Technical issues

Projects

    Thermal Engineering, Mechanics of solids, Project Management, Solar Energy, Human Resource Management, Environment Management

Experience

    • Sr. Faculty Member in Technical areas at the NTPC, Power Management Institute (PMI), Noida (Since Jan 2016)
    • Design and preparing technical specifications, estimates for various NTPC townships facilities related to HVAC, Fire-fighting, Water supply system, Sewarge treatment plant (Apr 2015-Jan2016)
    • More than 12 years of experience in Erection and Commissioning of thermal power plants. Looked after detailed Erection, Commissioning and Performance Guarantee Tests of Coal Handling Plant, Ash Handling Plant, Ash Water Re-circulation System and Condensate Polishing Unit in Sipat Thermal Power Plant, Bilaspur, C.G., NTPC (2003-2015)